Certified Maintenance & Reliability Professional (CMRP) Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the Certified Maintenance and Reliability Professional Exam. Utilize flashcards and multiple choice questions, each with explanations and tips. Ensure exam success!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What strategy is NOT a recognized process improvement method for reducing plant energy consumption?

  1. Total Productive Maintenance

  2. Right-sized equipment

  3. Reduced workforce

  4. Standard work and visual controls

The correct answer is: Reduced workforce

The strategy recognized as not being a process improvement method for reducing plant energy consumption is the reduction of workforce. Focusing on workforce reduction may lead to immediate cost savings, but it does not inherently contribute to energy efficiency or process improvements. In many cases, a reduced workforce can lead to increased stress on remaining employees, potential skill gaps, and reduced morale, which may ultimately undermine the overall productivity and efficiency of the plant. Conversely, strategies such as Total Productive Maintenance involve maintaining and improving equipment effectiveness, which can lead to better energy utilization. Right-sizing equipment refers to optimizing equipment capacity to match production needs, thereby reducing excess energy consumption. Standard work and visual controls enable consistent practices that can streamline operations and minimize waste, including energy waste, contributing to overall energy efficiency goals. Therefore, the focus on workforce reduction is not aligned with recognized methods aimed at improving energy consumption in plant operations.